Overview 3.50 – 3.70 UEF Meets NEEA Tier 3 Requirements Grid-Enabled for Utility-Level Performance Monitoring High Efficiency Meets ENERGY STAR® requirements Increased property value for consumers Easy Installation Easily Ducted — for installation in smaller spaces with minimal make up air required Easy access to side water connection and top electrical junction box; Zero to minimal clearance required in the back or side of the unit 3/4″ NPT water inlet & outlet; 3/4″ condensate drain connections Dry fire protection Available EcoNet® Smart Technology WiFi connected for mobile access Energy usage reporting Grid interactive for utility demand response / load management programs